How do I legalize tolerated construction (търпим строеж) in Bulgaria?
A building without permit papers can be tolerated (търпим) if it was built before 31 March 2001 and was allowed under the rules of that time; it then does not have to be demolished and you can get a certificate from the municipality. I can report this as an architect with 7+ years of experience in Germany, Austria and Bulgaria, as of 2026. Buildings from 7 April 1987 or earlier fall under a separate, older provision.
Many properties in Bulgaria carry a house, garage or annex built years ago without full paperwork. If it meets the conditions of the law, it is tolerated and can stay.
What is tolerated construction in Bulgaria?
It is a building without construction documents that was permissible under the rules in force when it was built and that was erected before a cut-off date. The cut-off in the current transitional provisions is 31 March 2001.
Buildings erected up to 31 March 2001 for which there are no construction documents, but which were permissible under the provisions in force at the time they were built or under the current provisions of this Act, are tolerated buildings and are not subject to demolition or a ban on use. They can be the subject of a transfer deal after presenting a certificate from the competent authorities that the buildings are tolerated. — § 127 (1) of the Transitional and Final Provisions of the ZUT (Закон за устройство на територията), lex.bg
Two points matter for you. The building must have been allowed on that plot under the rules of its time, and you need the municipal certificate if you want to sell it. The law also contains an older cut-off (7 April 1987) in § 16, so the year of construction decides which provision is checked.
What if my building is newer than 2001?
Then it is not tolerated construction, and a different procedure applies. Whether it can be legalized depends on the date and on the rules for your plot, so the first step is always an assessment of the specific case. I do not give a blanket answer here. See my page on building legalization.
How do I get the tolerated-construction certificate?
You apply to the municipality (the chief architect’s office). You need to show the building, its age and that it complied with the rules then in force. In practice this means:
- proof of ownership and a current sketch of the plot,
- an accurate plan of the building as it stands,
- evidence of its age (old aerial photos, cadastre extracts, earlier plans, utility documents),
- the application and the municipality’s check on site.
Which documents the office accepts varies by municipality, so I clarify this before I file.
Where to start
The starting point is an architectural survey of the existing building. It shows the exact factual condition that the whole file to the municipality is built on. My survey service is here: architectural measuring.
Related cases:
- A room used differently than documented: change of use for a room.
- An attic turned into a room without documents: attic conversion to residential space.
- An old garage without documents: see the garage project service for the rules on a new one.
What do I do for you?
I visit the site and assess whether your case meets the conditions. I prepare the documentation, submit it to the municipality and follow the file through to a decision: legalization of buildings.
What does it cost?
Every case differs in history, documents and condition, so I quote a price only after I have reviewed the specific property. Contact me and I will review your documents and tell you honestly what your real options are.
Frequently Asked Questions
Is every old structure automatically tolerated?
No. The building must have been permissible under the rules of its time and must predate the cut-off date. Every case is assessed on its own.
What happens if the structure does not qualify as tolerated?
Then a different procedure applies, which may include a further survey or, in the worst case, a requirement for removal. This is why the initial assessment matters.
Can I sell a tolerated building?
Yes, after you present the certificate from the municipality that the building is tolerated. Without it, a sale is difficult.
Is a survey needed before filing the case?
Yes, in almost every case. Without an accurate plan of the existing condition, the file rarely moves forward at the municipality.