Is a garage category six in Bulgaria, and what does the procedure require?
A private garage in Bulgaria is normally category six, the simplest class, but it still needs a building permit on a structural engineer's design. I can report this as an architect with 7+ years of experience in Germany, Austria and Bulgaria, as of 2026.
Most garages for private use in Bulgaria are category six. That makes the procedure lighter, not absent.
What decides the category?
The ZUT puts into category six the buildings of Art. 147 (Art. 137 (1) 6). Ancillary buildings such as a private garage are there, unless they serve production, public service or trade, which makes them category five (Art. 137 (1) 5 в). A different structure or a connection to living space is something I check on site first.
Do I need a building permit?
Yes. What the law drops is the approval of the investment project.
Approval of investment projects for a building permit is not required for ancillary buildings, except those meant for production, public service or trade and those under Art. 151 (1). — Art. 147 (1) 1 ZUT (Закон за устройство на територията), lex.bg
The permit is issued on application and a structural engineer’s design solution (Art. 147 (2) 1 ZUT). Do not start building before it is issued.
What the documentation includes
Drawings at the right scale, the position on the plot relative to the boundaries, and a structural solution for roof and supports. The explanatory note tells the municipality what is built.
Next step
I prepare the documents in my garage project service. If you also plan a carport or shed, I handle both in one request. For the design choices, see attached or detached garage.
Frequently asked questions
Is a garage always category six?
For a normal private garage usually yes, since it is an ancillary building. A garage for production, public service or trade is category five.
Do I need a building permit for a category six garage?
Yes. The law only drops the approval of the investment project; the building permit, issued on a structural engineer’s design, remains.
How long does approval take?
It depends on the municipality and on how complete the documents are. I give a realistic timeline after the site assessment.